Además de llevar a cabo proyectos llave en mano, TAHAL ejecuta una gama de modelos de asociaciones público-privadas (APP), incluido los modelos de Construcción-Propiedad-Operación (BOO), Construcción-Operación-Transferencia (BOT) y Transferencia-Operación-Transferencia (TOT).

Al combinar la experiencia de trabajo con estos diversos modelos, la gestión de proyectos y las capacidades de ingeniería, TAHAL ayuda a los clientes a implementar y operar proyectos económicamente factibles.

FILTRE SUS RESULTADOS:
  • RESULTADOS DEL FILTRO:
  • TERRITORIO:TODO
  • SERVICIOS:ASOCIACIONES PÚBLICO-PRIVADAS (APP)
  • ESPECIALIZACIÓN:TODO

Industrial & Domestic WWTP and Collector Pipelines, Kocaeli Province

BOT project for design, supply and construction of WWTP to treat wastewater from the industrial zone and domestic wastewater from two municipalities. Process includes physical, chemical & biological treatment, plus sludge dehydration. Initial 14,500 m3/day capacity will grow to 21,000 m3/day. Works include collector pipelines (35 km), 10 pumping stations and
Lee mas

Xuanhua Wastewater Treatment & Water Reuse – Transfer-Operate-Transfer (TOT) Project

Serving local population of 320,000 and all nearby industries, with current capacity of 120,000 m3/day (WWTP) and 120,000 m3/day recycled water, meeting Class IA effluent standards.
Lee mas

Dazhou Water Treatment & Wastewater Treatment Project (BOO)

Dazhou Water Treatment Plant (WTP) – current capacity of 100,000 m3/day, expected to increase by an additional 50,000 m3/day in Phase II (2014), and an additional 100,000 m3/day around 2020. Dazhou Wastewater Treatment Plant (WWTP) – current capacity of 10,000 m3/day, meeting Class IA effluent
Lee mas

Palmachim Seawater Desalination Facility, Kibbutz Palmachim

Financing, design, construction, supply, installation and O&M of reverse osmosis seawater desalination plant for the production and supply of 45 MCM/yr under a build-own-operate (BOO) contract.
Lee mas

HAGAL (Talia) Sanitary Landfill, Jordan Valley

BOT project for design, construction, operation and closure of a 34 ha 1,000 ton/day modern landfill site according to international methods and standards that ensure full environmental protection, including prevention of unpleasant odours and preservation of groundwater resources. Includes an energy centre that uses biogas produced at the site for the generation of
Lee mas