territories

Los sistemas de suministro de agua y riego seguros y confiables, junto con las mejoras en la agricultura a nivel local, son muy importantes en Asia. Como tales, las soluciones de TAHAL en Asia incluyen la capacitación de los usuarios que gestionarán y operarán los sistemas locales y el avance de cuestiones de género.

TAHAL comenzó a trabajar en Asia en la década de 1960 y lanzó sus operaciones en India en 1992. Actualmente la compañía mantiene oficinas sucursales en tres mercados en crecimiento, India, Tailandia y Sri Lanka, para fortalecer su presencia regional.

FILTRE SUS RESULTADOS:
  • RESULTADOS DEL FILTRO:
  • TERRITORIO:ASIA
  • SERVICIOS:TODO
  • ESPECIALIZACIÓN:TODO

Xuanhua Wastewater Treatment & Water Reuse – Transfer-Operate-Transfer (TOT) Project

Serving local population of 320,000 and all nearby industries, with current capacity of 120,000 m3/day (WWTP) and 120,000 m3/day recycled water, meeting Class IA effluent standards.
Lee mas

Dazhou Water Treatment & Wastewater Treatment Project (BOO)

Dazhou Water Treatment Plant (WTP) – current capacity of 100,000 m3/day, expected to increase by an additional 50,000 m3/day in Phase II (2014), and an additional 100,000 m3/day around 2020. Dazhou Wastewater Treatment Plant (WWTP) – current capacity of 10,000 m3/day, meeting Class IA effluent
Lee mas

Northeast Irrigation Project, Stage II – Lam Pao, Lam Takhong and Nam Pong

Design and construction supervision of irrigation & drainage systems for 70,000 ha, as follow-up to feasibility study carried out by TAHAL. Included review of existing plans; surveys; pedological and hydrological studies to determine flood control requirements; and detailed design & tender documents.
Lee mas

Bhairawa-Lumbini Groundwater Irrigation Project

Feasibility study, design, construction supervision and study of institutional/legal aspects in development of groundwater resources for both, dry season and supplementary monsoon season irrigation. Included drilling of 79 tubewells over 20,600 ha, formulation of institutional framework and WUA establishment.
Lee mas

Development of Water Resources of Kalu Ganga Basin including Flood Protection

Prefeasibility study for flood protection of Kalu Ganga Basin and feasibility study for construction of 70 m high multipurpose Ratnapura Dam for flood protection and hydropower. Included installation/calibration of SOBEK flood control model, field investigations and tender document preparation.
Lee mas

Urban Water Supply, Storm Water Drainage, Underground Sewerage & Road Restoration

Guwahati Metropolitan Development Authority Description: Development of urban water supply, sewerage & drainage systems for 260 km2 area. Includes water treatment plants, pipelines, storage reservoirs and collection, treatment & disposal of domestic/industrial wastewater.
Lee mas

Water Resources Planning for the State of Rajasthan

Statewide master plan for water resource management/development, including improvement of data collection/processing; groundwater, artificial recharge and conjunctive use studies; equipment procurement; training; and technical assistance.
Lee mas