territories

shutterstock_222493285En plus de la réalisation de projets clés en main, TAHAL réalise une gamme de modèles de partenariat public-privé (PPP), y compris des construction-propriété-exploitation (CPE / BOO), construction-exploitation-transfert (BOT) et transfert-exploitation-transfert (TOT).

En combinant l’expérience de travail avec ces différents modèles et la gestion de projets et ses capacités d’ingénierie, TAHAL aide les clients à mettre en place et à exploiter des projets économiquement viables.

FILTRER VOS RÉSULTATS:
  • FILTER RESULTS:
  • Déploiement territorial:Tout
  • Services:PARTENARIAT PUBLIC-PRIVÉ (PPP)
  • Spécialisation:Tout

Industrial & Domestic WWTP and Collector Pipelines, Kocaeli Province

BOT project for design, supply and construction of WWTP to treat wastewater from the industrial zone and domestic wastewater from two municipalities. Process includes physical, chemical & biological treatment, plus sludge dehydration. Initial 14,500 m3/day capacity will grow to 21,000 m3/day. Works include collector pipelines (35 km), 10 pumping stations and
Read More

HAGAL (Talia) Sanitary Landfill, Jordan Valley

BOT project for design, construction, operation and closure of a 34 ha 1,000 ton/day modern landfill site according to international methods and standards that ensure full environmental protection, including prevention of unpleasant odours and preservation of groundwater resources. Includes an energy centre that uses biogas produced at the site for the generation of
Read More

Palmachim Seawater Desalination Facility, Kibbutz Palmachim

Financing, design, construction, supply, installation and O&M of reverse osmosis seawater desalination plant for the production and supply of 45 MCM/yr under a build-own-operate (BOO) contract.
Read More

Xuanhua Wastewater Treatment & Water Reuse – Transfer-Operate-Transfer (TOT) Project

Serving local population of 320,000 and all nearby industries, with current capacity of 120,000 m3/day (WWTP) and 120,000 m3/day recycled water, meeting Class IA effluent standards.
Read More

Dazhou Water Treatment & Wastewater Treatment Project (BOO)

Dazhou Water Treatment Plant (WTP) – current capacity of 100,000 m3/day, expected to increase by an additional 50,000 m3/day in Phase II (2014), and an additional 100,000 m3/day around 2020. Dazhou Wastewater Treatment Plant (WWTP) – current capacity of 10,000 m3/day, meeting Class IA effluent
Read More