territories

US Steel Waste Management Facility

Feasibility study, EIA and preliminary & detailed design of 37 ha complex for industrial solid waste landfill and leachate WWTP, including application for required permits. Facility is designed to handle a total of 4,215,000 m3 of non-hazardous waste and 242,000 m3 of hazardous waste in two 5-year phases.

ЗАКАЗЧИК:

US Steel Serbia d.o.o

РЕГИОН:

Европа
Accessibility